Как выбрать гостиницу для кошек
14 декабря, 2021
Сегодня каждый, кто собирается в отпуск и не знает, с кем оставить своего котика или кошку, может во[...]
This is the process of lining the digester by mortar or using sheets of foam as in Figure 17. This is one of the most important construction steps and should be carefully and accurately achieved. In case of lining, the process is performed using mortar containing 1 % silica. After the completion of the lining, the digester is painted using the petroleum Albumen. In other designs, the walls are heat insulated with a clad with non-corroding and weather-proof aluminum trapezoidal panels. On the other hand, the rural digesters are coated with layers of dry dirt and asbestos.
Fig. 17. Installing the insulation (BIOGAS NORD GmbH) |
Пн | Вт | Ср | Чт | Пт | Сб | Вс |
---|---|---|---|---|---|---|
1 | 2 | 3 | ||||
4 | 5 | 6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 |
14 декабря, 2021
1 декабря, 2021
21 сентября, 2021
17 сентября, 2021
7 сентября, 2021