Current status and conclusions

As of September 2008 the cold box, reject heat exchangers and ice bank are complete and the other components are all under construction. Laboratory testing with a dummy (electrical) heat source is scheduled for October and shipping for solar tests in November.

References

[1] R. E. Critoph, Z. Tamainot-telto, S. J. Metcalf, "Advanced regenerative adsorption air conditioning unit", International Heat Powered Cycles Conf. 2006 (Ian W. Eames, eds), Newcastle, UK, Paper 06123,

(Sep 2006)

[2] R. E. Critoph, "Heat Exchanger", P113950WO, (Sep 2007)