This part is aimed through a check list at answering the following question : is the project compatible with solar cooling technology? The different steps of the check list based on a scoring method are the following :
• general presentation of the list : what? how?
• questionnaire to fill in with scores for each question with values from 1 to 3
• analysis of the results of the scoring total values
• advice on the opportunity of a solar cooling project
Large industry utility |
Public office building |
Hotel |
|||
Building |
Climate |
3 |
3 |
3 |
|
Important area for solar collectors |
3 |
2 |
2 |
||
Space for the technical premises |
3 |
2 |
1 |
||
Distribution network adapted |
3 |
3 |
2 |
||
TECHNICAL |
Existing or planned conventionnal material adapted |
3 |
3 |
3 |
|
FEASIBILITY |
Load |
Daily adequation production <-> load |
3 |
3 |
1 |
Yearly adequation production <-> load |
3 |
2 |
2 |
||
Hot water and heating needs all year long |
3 |
2 |
2 |
||
Solar system unders izement possible with a back up |
3 |
3 |
2 |
||
Energy cost |
High level of substituted energy cost |
1 |
3 |
3 |
|
Reasonnable cost of water |
3 |
2 |
2 |
||
Bulling owner |
Possibility of making important investment |
3 |
3 |
1 |
|
ECONOMICAL |
Motivation of the bulding owner |
3 |
3 |
3 |
|
FEASIBILITY |
Importance of the mediatic impact |
3 |
2 |
3 |
|
Environmental politic actions |
3 |
3 |
3 |
||
Eligible to national and international grants |
1 |
3 |
2 |
||
Financial stability of the building owner |
3 |
3 |
1 |
||
ORGANISATIONAL FEASIBILITY |
O&M |
Skilled internal technical s taff |
3 |
2 |
2 |
Aware of O&M regular actions |
3 |
2 |
2 |
||
Monitoring |
Presence of a financed and long term telemonitoring |
2 |
3 |
2 |
|
TOTAL SCORE(on 60) : |
55 |
52 |
42 |
Fig. 2. Example of scoring for the check list method. |