Future Work

Future work will put emphasis on the following fields:

• Continuation of the system monitoring (first and second generation prototype) in order to implement and test the developed control algorithms.

• Technical redesign of the storage modules.

• Production of a second generation prototype module.

• Development of stable modified sorption materials.

The newly developed second generation prototype needs to be extensively tested, analysed and evaluated under laboratory and practical conditions as input for the finalisation of the product development and identification of the most attractive market.

Acknowledgements

We are grateful to our project partners from Fraunhofer Institute for Solar Energy Systems (Freiburg/Breisgau, Germany) and Sortech AG (Freiburg/Breisgau, Germany) for their valuable work which contributed to the success of the project. We thank the European Commission and the Austrian Federal Ministry of Transport, Innovation and Technology (BMVIT) for financial support of the projects HYDES and MODESTORE.

References

• W. Mittelbach: Final Report HYDES Project. Final Report of a Joule III Project, European Comission 2001

• Tomas Nunez, Hans-Martin Henning, Walter Mittelbach: High Energy Density Heat Storage System — Achievements and Future Work, ISES Solar World Congress 2003, Goteborg, Sweden