Steps for the development of AMP

The AMP can be developed in the following sequence:

1 Identification of degradation mechanisms and locations susceptible to ageing

2 Identification of the mitigation and preventive measures

3 Identification of the parameters to be controlled

4 Definition of the method for the detection of ageing effects

5 Definition of the monitoring, trending, condition evaluation

6 Definition of the acceptance criteria

7 Identification of the corrective actions

8 Organising the administrative control

9 Organising the operational experience feedback.

In reality, the development is some kind of iterative process and steps over­lap, as will be shown below.