Result of LWR-PuT

In MOX scenarios, the Rokkasho reprocessing plant (RRP) will be operated with annual capacity of 800 t and a MOX fabrication plant also (Fig. 19.6). The total amount of UO2-SF reprocessed is 34,500 tHM, slightly larger than the planned amount of 32,000 tHM. Thus, the present analysis assumes an extension of the RRP by several years. The MOX loading to a usual LWR is limited to 30 %, although the

1970

2000

2030

2060

2090

image316
Подпись: 19 Transmutation Scenarios after Closing Nuclear Power Plants 219

Electoricity generation capacity
(GWe)

 

image318
image319

о

1970 — 2000 — 2030 — 2060 —

>

P 2090 . 2120 — 2150 — 2180 —

 

3g

JO

 

image320

2180

 

image130image132

Подпись: Fig. 19.6 Result of LWR-PuT scenario Подпись: 220 K. Nishihara et at.

Electoricity generation capacity
(GWe)

 

MA inventory (t)

 

Pu inventory (t)

 

_L

_L

го

го

со

со

4*.

СЛ

о

СЛ

о

СЛ

о

СЛ

о

О

о

о

о

о

о

о

о

о

 

M -{^ O) 03 о ю о о о о о о о

image133

 

image326

image134image135