An experimental programme, the MEGAPIE project, began in 2000 at the Paul Scherrer Institut (PSI) in Zurich (Switzerland) concerning the construction of an intensive spallation neutron source at the existing SINQ facility. It appeared immediately that such a programme would show very interesting results for the ADSR problematics.
The objectives are to study all the steps of the operation of an industrial liquid metal spallation source: design, building, operating and decommission.
The feasibility studies were performed in 2000, and the conceptual design in 2001. The system integration could be done in 2003, and the first tests and commissioning in 2004.
The MEGAPIE specifications are shown in table 13.2, and a preliminary design in figure 13.2.
Table 13.2. MEGAPIE specifications.
|
Attatchment for Lifting Gear
Connectors for Supplies and Diagnostics
Shie/ding Plug
Heat removal zone
Manifold for Enclosure Coolant
Neutron production zone
Thermal Shield
Main Beam Window Inner Enclosure Window Outer Enclosure Window