Как выбрать гостиницу для кошек
14 декабря, 2021
Start-upAvill be defined as the point of commencement of control rod withdrawal or at the commencement of withdrawal of a specific group of rods, Normally, a reactor is considered shut down when the core is 1000 milliNiles reactivity below critical condition. Therefore start-up will be deemed to have commenced at some convenient stage of control rod withdrawal. This will normally be chosen at worst reactor conditions to ensure that the reactor remains subcritical in any event.
Checks on the state of the plant’s readiness will be made just prior and after the start-up has commenced. The majority will be before start-up has commenced as defined in the operating documents. The operating documents must clearly define the sequence and checks to be carried out and take the operator through the correct route for a successful start-up. Acknowledgement at each stage must be made by a signature at each step and major stages acknowledged by a senior person, usually the shift manager, for further progression.