Как выбрать гостиницу для кошек
14 декабря, 2021
Сегодня каждый, кто собирается в отпуск и не знает, с кем оставить своего котика или кошку, может во[...]
The identified changes in power, nuclear characteristics, and fuel weight will affect the HFIR facility infrastructure. At present, it appears that ORNL will need to: (1) increase the capacity of the cooling tower and the cold source helium refrigerator; (2) modify the reactor instrumentation and control systems to manage the increased heat load; (3) modify the fuel handling tools; and (4) reevaluate the core structural and seismic analyses. In addition, the spent fuel systems will need to be reevaluated, including the design analyses for the pool storage and fuel shipping containers.
Пн | Вт | Ср | Чт | Пт | Сб | Вс |
---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | 5 | ||
6 | 7 | 8 | 9 | 10 | 11 | 12 |
13 | 14 | 15 | 16 | 17 | 18 | 19 |
20 | 21 | 22 | 23 | 24 | 25 | 26 |
27 | 28 | 29 | 30 | 31 |
14 декабря, 2021
1 декабря, 2021
21 сентября, 2021
17 сентября, 2021
7 сентября, 2021