Как выбрать гостиницу для кошек
14 декабря, 2021
For the purposes of the present chapter and following the discussion in section 6.3, the sums of the O&M and fuel costs for land-based SMRs were taken equal to the corresponding sums for NPPs with the reference large reactors. For barge-mounted plants, the corresponding sums were multiplied by a factor of 1.5 reflecting the assumption of a higher O&M costs owing to the need of periodical factory repairs of a barge[56], see the discussion in Section 6.3. The resulting O&M and fuel costs (components of the LUEC) for SMRs plant configurations considered are given in Appendix 3 (Table A3.6).
4*335 MWe (USA) 5*125 MWe (USA) 2*300 MWe (Russia) 2*300 MWe, barge (Russia) 1 *90 MWe (Korea) 2*35 MWe, barge (Russia) 2*8 MWe, barge (Russia)
О
О
аз
Q_
аз
APWR/ABWR Advanced Gen III+
million USD