Day 2 (June 5) — Elicitation Coordination

Rob Tregoning started the morning by reviewing the agenda for the second day. There were six (6) basic items to cover. These were:

• Reviewing the elicitation questions

• Reviewing the leak rate versus pipe break size evaluation

• Addressing the non-piping LOCA evaluations

• Reviewing the conditional seismic evaluation

• Addressing the additional information required prior to the individual elicitations for piping and non-piping evaluations

• Elicitation scheduling

The specific objectives for the second day included:

• Finalize the elicitation question sets and to provide a consistent understanding of each question.

• Determine the methodology for evaluating non-piping LOCAs and the identification of non­piping base case data.

• Determine the methodology for evaluating conditional seismic loading including determination of the seismic loading magnitude.

• Determine what information the panelists will require prior to their elicitations and assign action items for providing information.

• Develop the final schedule and time-frame for the upcoming elicitations.