Как выбрать гостиницу для кошек
14 декабря, 2021
Requirements regarding the supplier’s engineering organisation, engineering and design process, design interfaces management, use of computer- assisted design (CAD) software and tools, project design manual, review and approval of design documentation by the owner and other aspects related to the management of the project engineering process will be specified in this section.
19.9.2 Procurement and supply chain management
This section should specify the requirements for the procurement process, formation of the supply chain for the project, use of subcontractors (i. e. from a list of owner-approved subcontractors), inspection plans, approval of manufacturing procedures, and project procurement procedures manual.
19.9.3 Project risk evaluation
This section should specify the requirements concerning the economic and financial aspects, as well as project scheduling and development, and other relevant information required by the vendor for the preparation and periodic updating of a project risk evaluation report, enabling the owner to assess the risk status of the project throughout its duration.