Arrangements for emergency plans are carried out in several emergency planning zones that are roughly circular around the facility. The on-site emergency zone is the area surrounding the facility within the security perimeter. It is the area under the immediate control of the facility or operator. The off-site emergency zone is the area beyond that under the control of the facility operator in which intervention could be needed for emergencies resulting in major off-site releases or exposures. The level of planning will vary depending on the distance from the facility.
The off-site emergency zone is usually divided in two subzones. The precautionary action zone is a pre-designated area around the facility where urgent protective action has been pre-planned and will be implemented immediately upon declaration of a general emergency, to substantially reduce the risk of severe deterministic health effects by taking protective action within this zone before or shortly after a release. The urgent protective action planning zone is a pre-designated area around the facility where preparations are made to promptly implement urgent protective action based on environmental monitoring data and assessment of facility conditions, the goal being to avert doses specified in international standards.
Figure 12.1 shows a conceptual distribution of the emergency planning zones around a nuclear power plant.
12.1 Emergency planning zones.