Regulatory authorities

The nuclear regulatory body needs to be created or expanded, with respon­sibility for defining all safety, safeguards and security requirements accord­ing to codes and standards and ensuring that they are met. The regulator will have a relevant role during the licensing process of a new NPP.

Assistance in developing human resources may be provided by the regu­latory body in the country of origin of the supplier or other regulatory bodies, and complemented by the IAEA and other international organizations.

Stakeholder

 

Activities

 

Подпись: © Woodhead Publishing Limited, 2012Подпись: Political decision makers Regulatory authorities Utility Подпись: Training organizationПодпись: Engineering and services companiesPower system planning

• Regulatory framework

• National infrastructure

• Codes and Standards

• Licensing

• Inspection

• Site selection

• Human resources plan

• Bid specification and evaluation

• Training system organization, materials development and delivery of training sessions

• Full-scope simulator

• Conceptual design

• Basic design

• Detailed design

• Equipment and plant specifications and drawing

• Physical protection

• Procurement

Staff1

Observations

15^25

45-65

Licensing effort: 150-200 man-years

50-100

The needs start to increase strongly when the commitments are made (letter of intent, contract, etc.)

25-45

15-25

Qualified instructors plus simulator engineers

250-350

10-12

20-50

25-40

Project engineering work requires some three million man-hours of effort over a relatively short period (3-5 years)

Stakeholder

Activities

Staff

Observations

Main suppliers and equipment vendors

• Equipment and component manufacturing

• Equipment erection

• Piping supporting and welding

• Non-destructive testing

3000

Manufacturing and construction are the activities that have by far the largest manpower requirements, of the order of 6000 people during its peak period

Construction

companies

• Construction, erection and installation of plant buildings

• Component and systems erection and installation

2000

1300

Plant operator

• Commissioning

• Operation and maintenance

40-50

400-1000

Major support during commissioning by the equipment manufacturers

Nuclear fuel cycle company and waste management

• Exploration

• Fuel fabrication

• Waste management

100-200

Decommissioning

organization

• Decontamination

• Dismantling

• Asset recovery

• Waste processing, storage and disposal

500-1000

 