Regenerative Energy

11

Pfarrami

parish office

Biasgang

Gememdenegel

□lazed corridor parish wing

Pfarrhaus

wcaraqc

The heating and electricity demand of the complete complex were reduced by integrated planning decisions to an extremely low energy level, so that the demand could be met completely and economically by regenerative sources of energy. Two-thirds of the heating energy is covered with free environmental energy by passive use of solar energy, facade — integrated collectors, ventilation with heat recovery, and an earth-to-air heat exchanger, which can also cool the inlet air in summer. The remaining third of the heating energy is supplied by a boiler fuelled with wood pellets. A photovoltaic array on the church roof provides the electricity needed.

Zuluft

Mb lift

Fassadenkollektor Kombispeicher Luftungsaniage/

Holzpellet- Luftkollektoren. Regenw.

E’dkanai

Warn etauschei

esse

Wendeiameiien zisterne

100m

facade collector combined tank ventilation system/ wood-pellet air-heating coll, rainwater cistern

heat exchanger

boiler

rotatable slats

underground

duct 100m

exhaust

Facade collectors on the vicarage

Air-heating collectors on the church

Cross-section indicating energy systems