Как выбрать гостиницу для кошек
14 декабря, 2021
7.2.1 SMR designs selected for the evaluation of deployment potential in niche markets
Deployment potential was evaluated for typical SMRs of the PWR type presented in Table 7.1. The independently estimated ranges of LUEC values given in Table 7.3 were used for the evaluation. Table 7.7 summarises the plant configurations with SMRs for which the evaluations were performed. For convenience, letter codes were attributed to each of the SMRs to denote plant configuration. The letter codes are decrypted as follows:
• PWR — pressurised water reactor;
• number, for example, -8 or -335, — electric output per reactor module;
• S — plant with a single reactor module;
• T — twin-unit plant;
• TT — two twin-unit plants;
• M — modular plant (with 5 or 6 reactor modules);
• B — barge-mounted plant;
• L — land-based plant;
The LUEC estimates in Table 7.7 are given for 5 % and a 10 % discount rate, and also with or without taking into account the heat credit from Table 7.6, to enable evaluation of the deployment potential of SMR plants operating in a co-generation mode.
Total electric |
LUEC at 5% |
LUEC at 5% |
LUEC at 10% |
LUEC at 10% |
|||
Plant configuration |
output of the |
Based on |
discount rate, |
discount rate, |
discount rate, |
discount rate, |
|
plant (net) MWe |
USD per MWh |
USD per MWh |
USD per MWh* |
||||
PWR-8TB |
ABV (Russia) |
||||||
twin-unit barge- |
15.8 |
192-203 |
128-145 |
352-374 |
234-268 |
||
mounted |
|||||||
PWR-35TB twin-unit barge — mounted |
70 |
KLT-40S (Russia) |
109-114 |
72-82 |
179-189 |
119-136 |
|
PWR-90SL |
SMART (Korea) |
||||||
single module |
<s> |
90 |
52-54 |
41-42 |
87-89 |
68-70 |
|
plant |
Table 7.7. Advanced SMRs (PWRs) for which the evaluations were performed taking into account the heat credit (where applies) |
625-750 |
n/a |
n/a |
PWR-302TB |
VBER-300 (Russia) |
||||||
twin-unit barge- |
604 |
54-55 |
n/a |
78-81 |
n/a |
||
mounted |
mPower (USA) |
69-73 |
116-125 |
PWR-302TL twin-unit land — based |
604 |
VBER-300 (Russia) |
47-50 |
34-38 75-81 |
55-61 |
large interconnected electricity grids (“on-grid” locations). Another segment of electricity markets associated with isolated or remote locations with small, local electricity grids or with no grids at all (“off-grid” locations) will be considered in more detail in Section 7.2.5.
The evaluations were performed for several electricity markets in Brazil, China, Japan, the Republic of Korea, the Russian Federation, and the United States, separately at a 5% and 10% discount rate. The selected countries represent both developed and transitional economies. No countries from the European Union were considered since SMRs are currently not considered for near term deployment in this region of the world.